APPLICATION GUIDES / INSTALLED CONSTRAINTS

Pancake motor integration starts with the machine.

Choose the decision your assembly needs to resolve: joint stack, moving service passage, scan motion or wheel duty. Each guide helps you prepare the installation constraints and acceptance evidence for a project-specific review.

Four machine decisions. Four different engineering briefs.

Start from known constraints. Keep open questions visible.

The guides collect requested dimensions, machine duty and document availability. They do not return a qualified model or replace an assembled-system test. If your project is still exploratory, use the broader application overview or define a motor envelope first.